Ports Infrastructure

Ecologically Enhanced Pier Blocks

CLIENTIGY Málaga Marina|
LOCATIONPort of Málaga, Spain|
YEAR 2022

Local supply chain integrated ECOncrete additives and surface agents to enhance the new marina pier’s ecological performance. 

IGY Málaga Marina sought to elevate the ecological profile of the new pier. The local contractors integrated ECOncrete’s bio-enhancing additive and solution without modifying standard construction practices. (Image: Pier blocks installed at the marina by local staff, 2022)

The marina pier blocks manufactured with ECOncrete technology supports the growth of diverse marine life and contributes to a balanced marine ecosystem. (Image: Biological growth on Pier blocks, eleven months post deployment, 2023)

The project was highlighted in Engineering With Nature’s Atlas, Volume 3, that showcases a wide variety of projects that embody the principles of Engineering With Nature and demonstrates the myriad of benefits nature-based solutions offer.

Malaga Marina Installation