Projects

Living-Ports-thumb-aspect-ratio-590-375
May 10, 2024
Living Ports: Next-Generation Port Infrastructure
Next-generation port infrastructure for the Living Ports Project
loader
header-aspect-ratio-590-375

Port of Bilbao Coastal Protection

Revetment retrofitting with Coastalock units at the Port of Bilbao to enhance resilience and marine biodiversity.
Dec 05, 2024
Bilbao, Spain
Header thumb

Nature-Inclusive Waterfront for East Side Coastal Resiliency

Boosting Manhattan's flood resilience with nature-inclusive tidal pools, armor units, and piles, enhancing marine biodiversity
Nov 19, 2024
New York, New York
sbp header

Land-Water Interfaces in the South Battery Park City Resiliency Project

Designing Land-Water Interfaces at the Pier A Inlet section of the South Battery Park City Resiliency Project in New York City, USA
Nov 11, 2024
New York, New York
Living-Ports-thumb-aspect-ratio-590-375

Living Ports: Next-Generation Port Infrastructure

Next-generation port infrastructure for the Living Ports Project
May 10, 2024
Vigo, Spain
gansevoort

Intertidal Ecosystems along an Urban Shoreline

In Hudson River Park Estuarine Sanctuary, Gansevoort Peninsula was designed to preserve and enhance the critical habitat of this thriving urban estuary ecosystem.
Nov 07, 2023
Manhattan, New York
Te ara tapua thumb

Nearshore habitats for marine life and coastal birds during coastal construction

To avoid a large-scale coastal construction disrupting local wildlife, concrete tidal pools which mimic rocky shoreline have been installed at nearshore habitats.
Nov 06, 2023
Wellington, New Zealand
vineyard wind thumb

Marine Mattresses – Vineyard Wind, USA

Martha's Vineyard, USA Cable protection and stabilization Status: Mattresses installed
Oct 08, 2023
Martha's Vineyard, Massachusetts
challenge-or-goal-aspect-ratio-590-375

UK Environment Agency Coastal Armoring Research, Newlyn, UK

ECOncrete Armor Blocks were selected as one of four solutions by the UK Environment Agency for coastal protection, providing key insights for future UK projects
May 06, 2023
Newlyn, Cornwall, UK
fue-header image

Subsea Interconnector Cable Protection

Custom designed bio-enhancing concrete units protecting a cable on the seabed between Fuerteventura and Lanzarote for the Spanish TSO Red Eléctrica.
Apr 25, 2023
Fuerteventura, Spain
rotterdam bio-enhancing quay wall

Port of Rotterdam Vertical Quay Wall Units

Port of Rotterdam's sheetpiled quay wall enhanced with ECOncrete technology
Sep 28, 2022
Rotterdam, The Netherlands
mallorca thumbnail

Port of Cala Ratjada Breakwater

Coastal protection for Port of Cala Ratjada's breakwater
Aug 29, 2022
Cala Ratjada, Mallorca
IGY Malaga Bio Enhancing Breakwater

IGY Malaga Marina Pier

Bio-enhancing concrete technology applied into concrete blocks at IGY Malaga Marina
May 09, 2022
Malaga, Spain
header-slider-aspect-ratio-590-375

Living Breakwaters, Staten Island, New York

Technology for the post-Hurricane Sandy Living Breakwaters Project
Apr 05, 2022
Staten Island, New York
toulon thumb@1.25x

Breakwater Renovation, Toulon, France

Ecologically enhanced tide pools reinforcing the breakwater along the Grande Jetée
Mar 11, 2022
Toulon, France
shark river_thumb

Shoreline stabilization for a highly eroded community waterfront

The New Jersey project involves the installation of 42 marine mattresses at the site, home to a community of approximately 200 houses.
Jun 15, 2021
Neptune, New Jersey
project san diego thumb

Port of San Diego Coastal Protection

The first installation of COASTALOCK across two sites along Harbor Island in the Port of San Diego. A total of 74 units will replace the existing riprap.
Mar 05, 2021
San Diego, California
Fort-Salonga_590-399-1-1-aspect-ratio-590-375

Long Island Sound Offshore Cable Protection

Protecting the energy transmission cables between Long Island and Connecticut integrating environmentally beneficial concrete technology.
Dec 01, 2020
Fort Salonga, New York
2024 Huron street

Ecological Toe Protection for a Residential Waterfront

Modular concrete armor units were installed in order to create a toe for revetment and provide robust protection from hydrodynamic forces.
Sep 25, 2019
Brooklyn, New York
monaco thumb

Integrating habitat into Monaco’s port infrastructure

The Monaco Government, working with the Environmental Department, has launched ECOncrete's environmental restoration project in order to increase marine biodiversity.
Feb 10, 2019
Fontvieille, Monaco
Rotterdam-NL_590-399-aspect-ratio-590-375

Ecological shorelines for the Port of Rotterdam’s infrastructure

Modernizing port infrastructure
Apr 29, 2018
Rotterdam, Netherlands
Florida_Goal-1-aspect-ratio-590-375

Stabilizing a hurricane-prone shoreline

Stabilizing a hurricane-prone shoreline
Apr 15, 2017
Port Everglades, Florida
Brooklyn-Bridge-Park_590-399-1-aspect-ratio-590-375

Brooklyn Bridge Park

As part of the holistic environmental theme of Brooklyn Bridge Park, two different enhancement projects using ECOncrete® technologies were incorporated into two piers.
Nov 01, 2013
New York, New York